The Tramline
CIM Bulletin, Vol. 71, No. 792, 1978
Peter C. Jones, Plant Superintendent, Cassiar Asbestos Corporation Limited, Cassiar, B.C.
Owing to the inadequacy of the ore transport system at Cassiar in the late 1960's, a new facility was required. This paper traces the various alternatives considered and gives a description of the tramline as installed. The problems encountered, changes made and future modifications are discussed in detail, together with the effects these have on maintenance and operations.
Mots Clés:
Cassiar Mine, Asbestos, Transportation, Tramlines, Loading, Ropes, Wire ropes, Cables.