LES MINES SELBAIE STORY: Engineering

CIM Bulletin, Vol. 83, No. 936, 1990

A.J.W. Law, General Manager, Engineering, Les Mines Selbaie, Toronto, Ontario

This paper deals with the organization of the central office technical areas and the role played during the feasibility studies, construction and operating phases of Les Mines Selbaie.
Mots Clés: Feasibility studies, Engineering, Les Mines Selbaie.
$20.00